Text Size A  A  A
Header Image 1 Header Image 4

Planning - Inspection

Planning Home

Building and Inspection: Fees

Revised March 4, 2002

Plumbing, Electrical and Mechanical Sub Permit Fees

Building Permit (1157 KB pdf)
Electrical and Mechanical Sub Permit  Payment Form (16KB pdf)

Fee

State surcharge is 1% of total building permit 

 

Minimum fee for any sub permit

$70

Electrical Fees

For each new or modified circuit

$20

Service change or power to panel (1 meter)

$70

Each additional meter on the same inspection

$20

Temporary power (each meter base)

$70

Mechanical Fees

For installation, relocation or modification of each appliance or piece of equipment regulated by the Mechanical Code, except as noted below

$20

For each new duct line and outlet

$20

For each commercial hood

$70

For each evaporative cooler

$70

Plumbing Fees

For each plumbing fixture or trap or set of fixtures on one trap (including supply and drainage piping)

$20

For each sand or grease trap

$20

For installation or alteration of supply or drainage piping, water heater, or water treatment device

$20

Note: In cases where this fee schedule cannot practically be applied the fees shall be determined by the building official.

 

Total Valuation

Fee

Less than $2,000

$24 for the first $500 plus $3.50 for each additional $100 or fraction thereof, to and including $2,000

$2,000 to $25,000

$76.50 for the first $2,000 plus $16.50 for each additional $1000 or fraction thereof, to and including $25,000

$25,000 to $50,000

$456 for the first $25,000 plus $12 for each additional $1000 or fraction thereof, to and including $50,000

$50,000 to $100,000

$756 for the first $50,000 plus $8.50 for each additional $1000 or fraction thereof, to and including $100,000

$100,000 to $500,000

$1,181 for the first $100,000 plus $6.50 for each additional $1000 or fraction thereof, to and including $500,000

$500,000 to $1,000,000

$3,781 for the first $500,000 plus $5.50 for each additional $1000 or fraction thereof, to and including $1,000,000

Over $1,000,000

$6,531 for the first $1,000,000 plus $4.50 for each additional $1000 or fraction thereof

Other Inspections and Fees:

1. Inspection outside of normal business hours  $50 per hour (minimum charge 2 hours)

2. Reinspection fees assessed under provisions of Section 108.2  $50

3. Additional plan review required by changes, additions, or revisions  $50 per hour (minimum charge 2 hours)

4. Inspection of Manufactured Homes  $50 per hour (minimum charge 4 hours)

5. Plans previously reviewed (card file plans)  $100

6. Review of plans over the counter  $100

7. Renewal of expired permit where only final inspections are required  $200 (for R-3 and U occupancies)

8. Fees for inspections or reviews not specifically listed shall be determined by the building official.

This site:  All SLCo

Divider Image 1 Divider Image 2

Salt Lake County Government Center – 2001 South State Street Salt Lake City, UT 84190 – 801 468-3000

SLCo Home | Mayor | Council | Government | Business | SLCo Web Sites | FAQ | SLCo Directory | Site Index | Search

webadmin@slco.org | Disclaimer | Copyright © 2004 Salt Lake County - All Rights Reserved | Privacy Statement | GRAMA Information

 
Link to SLCo home Link to SLCo home Link to SLCo home